(Spectrum Health) Butterworth Hospital
|
100 Michigan St NE |
|
|
Renovation |
Completed |
1995 |
|
$1,100,000 |
show |
(Spectrum Health) Butterworth Hsptl Bldg
|
100 Michigan NE |
|
|
New Construction |
Completed |
1992 |
|
$3,900,000 |
show |
(Spectrum Health) Butterworth Pkg Lot
|
Barclay |
|
|
New Construction |
Completed |
1993 |
|
$3,200,000 |
show |
(Spectrum Health) Butterworth Pwr Plnt
|
Ransom Ave NE |
|
|
New Construction |
Completed |
1993 |
|
$6,000,000 |
show |
(Spectrum Health) Med Office Bldg
|
221Michigan NE |
|
|
New Construction |
Completed |
1992 |
|
$15,000,000 |
show |
025 Division S
|
025 Division S |
|
|
Renovation |
Completed |
2000 |
|
$3,000,000 |
show |
100 Grandville
|
100 Grandville SW |
|
|
Renovation |
Completed |
1997 |
|
$2,300,000 |
show |
101 South Division
|
101 South Division |
|
|
Renovation |
Completed |
2009 |
|
$4,500,000 |
show |
120 Ionia SW
|
120 Ionia SW |
|
|
Renovation |
Completed |
2000 |
|
$2,600,000 |
show |
35 Oakes - The Forum
|
35 Oakes |
|
|
Renovation |
Planned |
2011 |
|
n/a |
show |
38 Commerce Parking Ramp
|
38 Commerce SW |
|
|
New Construction |
Completed |
2010 |
|
$9,000,000 |
show |
47 Commerce - Lambert Edwards
|
47 Commerce |
|
|
Renovation |
Under Construction |
2010 |
|
n/a |
show |
50 Monroe Place
|
50 Monroe NW,50 Monroe NW |
|
|
Renovation,Renovation |
Completed,Completed |
1998,1999 |
|
$10,800,001,080,000 |
show |
50 Monroe Place
|
50 Monroe NW,50 Monroe NW |
|
|
Renovation,Renovation |
Completed,Completed |
1998,1999 |
|
$10,800,001,080,000 |
show |
50 Monroe Place
|
050 Monroe NW |
|
|
Renovation |
Completed |
1986 |
|
$12,600,000 |
show |
65 Monroe Center Building
|
65 Monroe Center NW |
|
|
Renovation |
Completed |
2008 |
|
$5,000,000 |
show |
Ah Nab Awen Park Improvements
|
|
|
|
Renovation |
Completed |
2011 |
|
$350,000 |
show |
Aldrich Place
|
(95-99 Monroe Center NW) |
|
|
Renovation |
Completed |
1997 |
|
$2,000,000 |
show |
All City Kicks (Former Reptile House)
|
139 S Division |
|
|
Renovation |
Completed |
2005 |
|
$143,000 |
show |
Alten Place
|
015 Division S |
|
|
Renovation |
Completed |
1999 |
|
$453,000 |
show |
Amtrak Parking Lot
|
Market and Wealthy |
|
|
Public Works |
Completed |
2003 |
|
$482,148 |
show |
Amway Grand Plaza
|
187 Monroe NW |
|
|
Renovation |
Completed |
2001 |
|
$750,000 |
show |
Amway Grand Plaza
|
187 Monroe NW |
|
|
Renovation |
Completed |
1998 |
|
$1,200,000 |
show |
Anheuser Ice House
|
72 Grandville SW |
|
|
Renovation |
Completed |
2007 |
|
$1,650,000 |
show |
Arena SkyWalk
|
Ottawa to Campau |
|
|
Public Works |
Completed |
1997 |
|
$3,500,000 |
show |
Arena Station
|
025 Ottawa SW |
|
|
Renovation |
Completed |
1997 |
|
$6,500,000 |
show |
B. DeVries Office Bldg
|
234 N Division Bldg |
|
|
Renovation |
Completed |
1991 |
|
$1,500,000 |
show |
Bank One
|
200 Ottawa NW |
|
|
Renovation |
Completed |
1995 |
|
$1,000,000 |
show |
Barney Condominium
|
052 Monroe Center NW |
|
|
Renovation |
Completed |
1984 |
|
$400,000 |
show |
Beatnik Brewing
|
62 Commerce |
|
|
Renovation |
Proposed |
2011 |
|
n/a |
show |
Bicycle Factory Building
|
201 Front SW |
|
|
New Construction |
Completed |
2009 |
|
$20,000,000 |
show |
Blodgett Building
|
015 Ionia SW |
|
|
Renovation |
Completed |
2001 |
|
$1,112,800 |
show |
Blodgett Building
|
015 Ionia SW |
|
|
Renovation |
Completed |
1992 |
|
$5,500,000 |
show |
Boardwalk Apartments & Pkg Ramp
|
940 Monroe |
|
|
Renovation |
Completed |
2001 |
|
$31,000,000 |
show |
BOB Expansion
|
26 Monroe NW |
|
|
Addition |
Planned |
2011 |
|
$5,000,000 |
show |
Brass Works Building
|
648 Monroe NW |
|
|
Renovation |
Completed |
2001 |
|
$8,000,000 |
show |
Brass Works Building
|
648 Monroe NW |
|
|
Renovation |
Completed |
2001 |
|
$600,000 |
show |
Brickway Condominiums
|
56 Monroe Center NW |
|
|
Renovation |
Completed |
2008 |
|
$1,500,000 |
show |
Bridge Street Bridge
|
N/A |
|
|
Public Works |
Completed |
1988 |
|
$4,100,000 |
show |
Bridgewater Place
|
333 Bridge NW |
|
|
New Construction |
Completed |
1993 |
|
$55,000,000 |
show |
Bulls Head Tavern
|
188 Monroe NW |
|
|
Renovation |
Completed |
2000 |
|
$219,000 |
show |
Butterworth Hospital Improvement
|
100 Michigan NE |
|
|
Renovation |
Completed |
1989 |
|
$9,400,000 |
show |
Butterworth Hospital North Bldg
|
221 Michigan NE. |
|
|
New Construction |
Completed |
1989 |
|
$8,100,000 |
show |
Butterworth Hospital South Tower
|
100 Michigan NE |
|
|
Addition |
Completed |
1982 |
|
$13,500,000 |
show |
Calder Plaza Office Building
|
250 Monroe NW |
|
|
New Construction |
Completed |
1981 |
|
$11,200,000 |
show |
Calumet Flats
|
303 Division S. |
|
|
Renovation |
Completed |
1983 |
|
$150,000 |
show |
Campau Avenue
|
Monroe to Pearl |
|
|
Public Works |
Completed |
2007 |
|
$2,000,000 |
show |
Campau Avenue
|
Monroe to Pearl |
|
|
Public Works |
Completed |
1991 |
|
$275,000 |
show |
Campau Square Building
|
180 Monroe NW |
|
|
Renovation |
Completed |
1980 |
|
$1,200,000 |
show |
Campau Square Plaza Office Bldg
|
099 Monroe NW |
|
|
New Construction |
Completed |
1985 |
|
$17,000,000 |
show |
Canal Street Park & Flood Walls
|
North of Newberry |
|
|
Public Works |
Completed |
2001 |
|
$2,125,000 |
show |
Cathedral Square
|
267 Sheldon SE |
|
|
Renovation |
Completed |
2008 |
|
$22,000,000 |
show |
Catholic Central H.S. Classroom Bldg
|
319 Sheldon SE |
|
|
Addition |
Completed |
1988 |
|
$3,000,000 |
show |
Catholic Central H.S. Gymnasium
|
318 Division S. |
|
|
New Construction |
Completed |
1984 |
|
$2,000,000 |
show |
Catholic Central Math and Science Bldg
|
305 Sheldon SE |
|
|
New Construction |
Completed |
2000 |
|
$1,000,000 |
show |
Catholic Secondary Schools
|
359 Division S. |
|
|
Renovation |
Completed |
1989 |
|
$800,000 |
show |
Catholic Social Services
|
040 Jefferson SE |
|
|
Renovation |
Completed |
2001 |
|
$3,960,000 |
show |
Chaffee Apartments
|
128 S Division Av |
|
|
Renovation |
Completed |
1998 |
|
$950,000 |
show |
Charley's Crab Restaurant
|
063 Market SW |
|
|
New Construction |
Completed |
1981 |
|
$2,700,000 |
show |
Cherry St Landing WMU
|
200 Ionia SW |
|
|
Renovation |
Completed |
2001 |
|
$2,500,000 |
show |
Cherry St. Parking Structure
|
Cherry & Commerce |
|
|
New Construction |
Completed |
2007 |
|
$6,100,000 |
show |
Cherry Street Brick Street Reconstr
|
Ionia to Commerce |
|
|
Public Works |
Completed |
2003 |
|
$978,000 |
show |
Cherry Street Landing - Bank of Holland
|
75 Ionia SW |
|
|
New Construction |
Completed |
2005 |
|
$2,200,000 |
show |
Cherry Street Lofts - The Dayton Building
|
143 Cherry SE |
|
|
Renovation |
Completed |
2006 |
|
$1,300,000 |
show |
Cherry Street Reconstruction - Phase 2
|
Commerce to Division |
|
|
Public Works |
Completed |
2009 |
|
$2,000,000 |
show |
Cherry Street Reconstruction - Phase 3
|
Division to Sheldon |
|
|
Public Works |
Under Construction |
2010 |
|
$700,000 |
show |
Choice One
|
056 Grandville SW |
|
|
Addition |
Completed |
2000 |
|
$1,600,000 |
show |
City Center for State Offices
|
1 North Division |
|
|
Renovation |
Completed |
2002 |
|
$10,840,000 |
show |
City Center Plaza Shopping Mall
|
001 Monroe Center NW |
|
|
Renovation |
Replaced |
1985 |
|
$13,500,000 |
show |
City Flats Hotel (Fox Bldg)
|
83 Monroe Center NW |
|
|
Renovation |
Complete |
2011 |
|
$3,000,000 |
show |
City/ County Archive Center - Phase II
|
50 Jefferson SE |
|
|
New Construction |
Completed |
2003 |
|
$7,435,000 |
show |
City/County Archives Center Phase I
|
Washington SE |
|
|
New Construction |
Completed |
2000 |
|
$8,366,000 |
show |
Civic Theatre
|
034 Division N. |
|
|
Renovation |
Completed |
1989 |
|
$160,000 |
show |
Civil War Monument
|
Fulton and Monroe Center |
|
|
Public Works |
Completed |
2003 |
|
$250,000 |
show |
Comerica Bank
|
201 Monroe NW |
|
|
Renovation |
Completed |
1986 |
|
$130,000 |
show |
Commerce Avenue Reconstruction - Cherry St to Wealthy St
|
Commerce Ave |
|
|
Renovation |
Under Construction |
2010 |
|
$3,200,000 |
show |
Commerce Bldg - Ferris State University
|
5 Lyon NW |
|
|
Renovation |
Completed |
2004 |
|
$2,900,000 |
show |
Commerce Street Reconstruction
|
Fulton to Cherry |
|
|
Public Works |
Completed |
2004 |
|
$2,500,000 |
show |
Cooley Law School - Phase I
|
38 Oakes |
|
|
Renovation |
Completed |
2004 |
|
$12,400,000 |
show |
Cornerstone Bldg
|
089 Ionia NW |
|
|
Renovation |
Completed |
1990 |
|
$1,000,000 |
show |
DASH 9 Parking Lot - Phase I
|
Lake Michigan and Seward |
|
|
Public Works |
Completed |
2003 |
|
$1,200,000 |
show |
DASH 9 Parking Lot - Phase II
|
Lake Michigan and Seward |
|
|
Public Works |
Completed |
2004 |
|
$1,200,000 |
show |
DASH West Lots 7 & 8
|
Douglas to Lake Michigan Dr |
|
|
Public Works |
Completed |
1997 |
|
$2,500,000 |
show |
Day's Inn Hotel
|
310 Pearl NW |
|
|
New Construction |
Completed |
1987 |
|
$10,000,000 |
show |
Design Plus
|
201 Ionia SW |
|
|
Renovation |
Completed |
2000 |
|
$2,100,000 |
show |
DeVos Hall
|
245 Monroe NW |
|
|
Renovation |
Completed |
2004 |
|
$5,000,000 |
show |
DeVos Performance Hall
|
245 Monroe NW |
|
|
Renovation |
Completed |
1994 |
|
$740,000 |
show |
DeVos Place Convention Ctr - Phase I & II
|
245 Monroe Av NW |
|
|
New Construction |
Completed |
2003 |
|
$220,000,000 |
show |
Division Avenue
|
Cherry to Oakes |
|
|
Public Works |
Completed |
2005 |
|
$2,000,000 |
show |
Division Park Avenue Apartments
|
209/217 South Division, 17 Williams |
|
|
Renovation |
Planned |
2011 |
|
$11,000,000 |
show |
DLP Inc
|
217 Grandville SW |
|
|
Addition |
Replaced |
1992 |
|
$11,700,000 |
show |
Donovan Building
|
71 S Division |
|
|
Renovation |
Completed |
2004 |
|
$1,700,000 |
show |
Douglas J. Aveda Institute
|
138 Commerce SW |
|
|
Renovation |
Completed |
2007 |
|
$3,500,000 |
show |
Downtown YMCA
|
475 Lake Michigan NW |
|
|
New Construction |
Completed |
2005 |
|
$28,000,000 |
show |
Dwelling Place - Martineau Apartments
|
106 - 130 S Division |
|
|
Renovation |
Completed |
2005 |
|
$7,500,000 |
show |
Dwelling Place Admin Bldg
|
101 Sheldon SE |
|
|
Renovation |
Completed |
2003 |
|
$2,500,000 |
show |
Dwelling Place Inc Bldg
|
343 Division S |
|
|
Renovation |
Completed |
1991 |
|
$500,000 |
show |
Dwelling Place Inn
|
040 to 052 Division S. |
|
|
Renovation |
Completed |
1989 |
|
$700,000 |
show |
East Riverbank Walkways
|
Blue Bridge to Gillette Bridge |
|
|
Public Works |
Completed |
2001 |
|
$750,000 |
show |
Eastbank Plaza Towers
|
011 Monroe NW |
|
|
New Construction |
Completed |
1992 |
|
$60,000,000 |
show |
Eerdman Publishing Expansion
|
317 LaGrave SE |
|
|
Addition |
Replaced |
1987 |
|
$200,000 |
show |
Ellis Parking Ramp - 500 Space
|
119 Pearl NW |
|
|
New Construction |
Completed |
2002 |
|
$9,000,000 |
show |
EQ3
|
130 Ionia SW |
|
|
Renovation |
Completed |
2002 |
|
$900,000 |
show |
Family Care Medical Care Office Bldg
|
150 Jefferson SE |
|
|
Renovation |
Completed |
1987 |
|
$1,000,000 |
show |
Ferguson Hospital
|
072 Sheldon SE |
|
|
Renovation |
Replaced |
1985 |
|
$100,000 |
show |
Ferguson Hospital Doctor's Office
|
075 Sheldon SE |
|
|
New Construction |
Completed |
1987 |
|
$2,000,000 |
show |
Ferguson Renaissance Center
|
072 Sheldon SE |
|
|
Renovation |
Completed |
2002 |
|
$11,260,000 |
show |
Ferris State/Kendall/Christman Expansion - Old Art Museum
|
155 Division Ave N |
|
|
Renovation |
Planned |
2012 |
|
$33,000,000 |
show |
Fifth Third Bank
|
111 Lyon NW |
|
|
Renovation |
Completed |
1997 |
|
$4,400,000 |
show |
Fifth Third Bank (One Vandenberg Ctr)
|
111 Lyon NW |
|
|
Renovation |
Completed |
1996 |
|
$2,000,000 |
show |
Firestone Bldg
|
309 Jefferson SE |
|
|
Renovation |
Completed |
1988 |
|
$350,000 |
show |
Fish Ladder Park
|
624 Front NW |
|
|
Public Works |
Completed |
1987 |
|
$200,000 |
show |
Fish Ladder/Pump Statn
|
N/A |
|
|
Public Works |
Completed |
1993 |
|
$2,500,000 |
show |
Fitzgerald Condominiums
|
33 Library NE |
|
|
Renovation |
Completed |
2008 |
|
$20,000,000 |
show |
Flanagan's Pub
|
139 Pearl NE |
|
|
Renovation |
Completed |
1985 |
|
$600,000 |
show |
Flat Iron Building
|
100, 112, 114 Monroe Center NW |
|
|
Renovation |
Under Construction |
2010 |
|
$4,500,000 |
show |
Flatiron Building
|
107-115 Ottawa NW |
|
|
Renovation |
Completed |
1981 |
|
$500,000 |
show |
Fmr Heartside Manor
|
35 Oakes SW |
|
|
Renovation |
Under Construction |
2010 |
|
$5,000,000 |
show |
Fmr Imperial Metals Building
|
801 Ionia Ave NW |
|
|
Renovation |
Planned |
2011 |
|
$5,000,000 |
show |
Fmr Opus Room
|
58 Ionia Ave SW |
|
|
Renovation |
Completed |
1999 |
|
$1,200,000 |
show |
Fmr Prime Bank Building
|
171 Monroe NW |
|
|
New Construction |
Completed |
1982 |
|
$10,000,000 |
show |
Former Central Bank Bldg
|
065 Monroe Center NW |
|
|
Renovation |
Replaced |
1986 |
|
$1,200,000 |
show |
Former Milner Hotel - Beta Design Group
|
70 Ionia SW |
|
|
New Construction |
Completed |
2004 |
|
$5,000,000 |
show |
Former Post Office Garage
|
250 Commerce SW |
|
|
Renovation |
Completed |
2002 |
|
$940,000 |
show |
Forslund's Condominium Housing
|
252 Pearl NW |
|
|
Renovation |
Completed |
1984 |
|
$4,000,000 |
show |
Founders Bldg
|
048 Fountain NW |
|
|
Renovation |
Completed |
1987 |
|
$1,000,000 |
show |
Founders Brewery
|
235 Grandville SW |
|
|
Renovation |
Completed |
2007 |
|
$4,800,000 |
show |
Founders Trust Bank Building
|
161 Monroe NW |
|
|
Renovation |
Completed |
2007 |
|
$2,000,000 |
show |
Frey Building
|
300 Ottawa NW |
|
|
Renovation |
Completed |
1998 |
|
$300,000 |
show |
Front Ave. Improvement
|
Fulton to Pearl |
|
|
Public Works |
Completed |
1987 |
|
$428,000 |
show |
Front Row Condominiums
|
51-63 Monroe Center NW |
|
|
Renovation |
Completed |
2006 |
|
$5,000,000 |
show |
FSU/Kendall College
|
017 Fountain &110 Ionia NW |
|
|
Addition |
Completed |
1999 |
|
$3,000,000 |
show |
Fulton Street
|
River to Division Ave |
|
|
Public Works |
Replaced |
1991 |
|
$1,600,000 |
show |
Fulton-Commerce Bldg
|
038 Fulton |
|
|
Renovation |
Completed |
1987 |
|
$1,400,000 |
show |
Furniture Building
|
082 Ionia NW |
|
|
Renovation |
Completed |
1998 |
|
$975,000 |
show |
Furniture Company Bldg
|
082 Ionia NW |
|
|
Renovation |
Completed |
1980 |
|
$5,200,000 |
show |
Gerald R Ford Presidential Museum
|
303 Pearl NW |
|
|
New Construction |
Completed |
1981 |
|
$10,000,000 |
show |
Gerald R. Ford Presidential Museum
|
303 Pearl NW |
|
|
Renovation |
Completed |
2003 |
|
$6,350,000 |
show |
Gillette Bridge
|
Devos Place to Ah-Nab-Awen Park |
|
|
Public Works |
Completed |
1998 |
|
$400,000 |
show |
Globe Apartments
|
315 Commerce SW |
|
|
Renovation |
Completed |
2001 |
|
$8,407,000 |
show |
Goodspeed Building
|
190 Monroe NW |
|
|
Renovation |
Completed |
2003 |
|
$1,300,000 |
show |
Goodspeed Building
|
190 Monroe NW |
|
|
Renovation |
Completed |
1982 |
|
$1,000,000 |
show |
GR Children's Museum
|
11 Sheldon Av NE |
|
|
Renovation |
Completed |
1997 |
|
$1,700,000 |
show |
GR Museum - Van Andel Museum Center
|
272 Pearl St NW |
|
|
New Construction |
Completed |
1994 |
|
$33,000,000 |
show |
Grand Center/DeVos Hall, Pkg Ramp
|
245 Monroe NW |
|
|
New Construction |
Replaced |
1980 |
|
$25,000,000 |
show |
Grand Plaza Hotel
|
187 Monroe NW |
|
|
Renovation |
Completed |
1982 |
|
$60,000,000 |
show |
Grand Plaza Parking Ramp
|
218 Pearl NW |
|
|
New Construction |
Completed |
1981 |
|
$7,700,000 |
show |
Grand Plaza Place
|
220 Lyon NW |
|
|
Renovation |
Completed |
1987 |
|
$6,400,000 |
show |
Grand Rapids Art Museum
|
125 Monroe Center NW |
|
|
New Construction |
Completed |
2007 |
|
$55,000,000 |
show |
Grand Rapids Art Museum
|
155 Division N. |
|
|
Renovation |
Replaced |
1981 |
|
$3,300,000 |
show |
Grand Rapids Ballet Building
|
341 Ellsworth SW |
|
|
Renovation |
Completed |
2002 |
|
$2,300,000 |
show |
Grand Rapids Civic Theatre
|
34 N Division |
|
|
Renovation |
Completed |
2006 |
|
$14,000,000 |
show |
Grand Rapids Community Foundation HQ
|
185 Oakes SW |
|
|
Renovation |
Completed |
2008 |
|
$3,000,000 |
show |
Grand Rapids Museum Pkg Ramp (200 spaces)
|
310 Pearl NW |
|
|
New Construction |
Completed |
1994 |
|
$3,000,000 |
show |
Grand Rapids Police Dept
|
001 Monroe Ctr NW |
|
|
Renovation |
Completed |
2001 |
|
$4,160,000 |
show |
Grand Rapids Properties Bldg
|
64 Ionia SW |
|
|
Renovation |
Completed |
2006 |
|
$2,100,000 |
show |
Grand Rapids Public Library Bldg
|
60 Library Plaza NE |
|
|
Renovation |
Completed |
2003 |
|
$17,000,000 |
show |
Grand Woods Lounge
|
77 Grandville SW |
|
|
Renovation |
Completed |
2006 |
|
$1,600,000 |
show |
Grandville Avenue Reconstruction - Oakes to Weston
|
Grandville Avenue |
|
|
Renovation |
Under Construction |
2011 |
|
n/a |
show |
GRCC
|
143 Bostwick NE |
|
|
Renovation |
Completed |
1998 |
|
$535,000 |
show |
GRCC Applied Technology Ctr
|
151 Fountain NE |
|
|
New Construction |
Completed |
1991 |
|
$25,000,000 |
show |
GRCC Expansion - Old Davenport Campus
|
415 Fulton St E |
|
|
Renovation |
Planned |
2012 |
|
$15,000,000 |
show |
GRCC Lyon St. Pkg Ramp (770 spaces)
|
25 Lyon St. NE |
|
|
New Construction |
Completed |
1994 |
|
$8,000,000 |
show |
GRCC Main Building
|
143 Bostwick Ave NE |
|
|
Renovation |
Completed |
2001 |
|
$6,000,000 |
show |
GRCC Mall Area
|
Bostwick NE |
|
|
Public Works |
Completed |
2000 |
|
$1,000,000 |
show |
GRCC Natural Science Bldg
|
226 Bostwick NE |
|
|
New Construction |
Completed |
2001 |
|
$30,000,000 |
show |
GRCC Parking Ramp
|
140 Bostwick Ave NE |
|
|
Renovation |
Completed |
1990 |
|
$4,320,000 |
show |
GRCC Parking Ramp Rehab
|
140 Bostwick |
|
|
Renovation |
Completed |
2001 |
|
$500,000 |
show |
GRCC Spectrum Theater
|
160 Fountain St NE |
|
|
Renovation |
Completed |
1997 |
|
$5,300,000 |
show |
GRCC Street Lighting
|
Entire Campus |
|
|
Renovation |
Completed |
1999 |
|
$360,000 |
show |
GRCC Student Ctr & Pkg Ramp
|
110 Lyon NE |
|
|
New Construction |
Completed |
1981 |
|
$6,000,000 |
show |
Gunn Block
|
007 Ionia SW |
|
|
Renovation |
Completed |
1981 |
|
$125,000 |
show |
Gus Bus Parking Lots
|
N/A |
|
|
Public Works |
Completed |
1988 |
|
$4,500,000 |
show |
GVSU - Keller Engineering Building
|
301 Fulton W. |
|
|
New Construction |
Completed |
2000 |
|
$7,000,000 |
show |
GVSU - Richard M. DeVos Center
|
510 Fulton St SW |
|
|
New Construction |
Completed |
2000 |
|
$56,500,000 |
show |
GVSU - Secchia Hall Apartments
|
400 Fulton St SW |
|
|
New Construction |
Completed |
2000 |
|
$7,850,000 |
show |
GVSU - Health Professions Bldg.
|
301 Michigan NE |
|
|
New Construction |
Completed |
2003 |
|
$57,000,000 |
show |
GVSU - Winter Hall
|
Winter SW |
|
|
New Construction |
Completed |
2003 |
|
$11,700,000 |
show |
GVSU College of Engineering Kennedy Hall
|
301 W Fulton |
|
|
New Construction |
Completed |
2007 |
|
$16,000,000 |
show |
GVSU Eberhard Center
|
301 Fulton W |
|
|
New Construction |
Completed |
1988 |
|
$22,000,000 |
show |
GVSU New Parking Structure
|
Lake Michigan Dr & Seward |
|
|
New Construction |
Completed |
2004 |
|
$20,000,000 |
show |
GVSU Seidman College of Business
|
38 Front Ave |
|
|
New Construction |
Proposed |
2012 |
|
$40,000,000 |
show |
Health Park Central
|
245 Cherry SE |
|
|
New Construction |
Planned |
2011 |
|
$30,000,000 |
show |
Heart of the City Health Center
|
211 LaGrave SE |
|
|
New Construction |
Planned |
2010 |
|
$30,000,000 |
show |
Heartside Ministries
|
052 Division S |
|
|
Renovation |
Completed |
2001 |
|
$523,581 |
show |
Heartside Park
|
300 Block Ionia |
|
|
Public Works |
Completed |
2003 |
|
$530,000 |
show |
Helen Devos Children's Hospital
|
621 Sheldon Blvd SE |
|
|
New Construction |
Completed |
1995 |
|
$47,000,000 |
show |
Herkimer Apartments
|
323 S Division |
|
|
Renovation |
Completed |
1995 |
|
$5,000,000 |
show |
Holiday Inn Express
|
310 Pearl NW |
|
|
Renovation |
Completed |
2009 |
|
n/a |
show |
Hope Lodge
|
240 Jefferson SE |
|
|
New Construction |
Completed |
2007 |
|
$6,800,000 |
show |
Hopson Flats Apartments/Retail
|
212-216 Grandville SW |
|
|
Renovation |
Completed |
2007 |
|
$9,000,000 |
show |
Houseman & Braundy Bldg
|
132-140 Monroe Center NW |
|
|
Renovation |
Completed |
1986 |
|
$2,200,000 |
show |
Houseman Building
|
104 Monroe Center NW |
|
|
Renovation |
Completed |
2006 |
|
$400,000 |
show |
I-196 Rebuild from Grand River to Fuller
|
I-196 |
|
|
Renovation |
Under Construction |
2010 |
|
$40,000,000 |
show |
Icon on Bond Condominiums
|
Trowbridge and Bond |
|
|
New Construction |
Completed |
2007 |
|
$30,000,000 |
show |
Independent Liberty Building Rehab
|
126 Ottawa NW |
|
|
Renovation |
Replaced |
1980 |
|
$360,000 |
show |
Intersection Lounge
|
133 Grandville SW |
|
|
Renovation |
Completed |
2002 |
|
$151,000 |
show |
Interurban Transit Partnership Office
|
300 Ellsworth SW |
|
|
Renovation |
Completed |
2002 |
|
$1,700,000 |
show |
Ionia Ave Historic Streetscape
|
Cherry to Bartlett |
|
|
Public Works |
Completed |
2000 |
|
$1,054,000 |
show |
Ionia Avenue
|
Bartlett to Wealthy |
|
|
Public Works |
Completed |
2003 |
|
$1,717,000 |
show |
Ionia Avenue
|
Fountain to Michigan |
|
|
Public Works |
Completed |
2005 |
|
$1,200,000 |
show |
Ionia Avenue
|
Lyon to Michigan |
|
|
Public Works |
Completed |
2006 |
|
$2,500,000 |
show |
Ionia Avenue Historic Streetscape
|
Fulton to Oakes |
|
|
Public Works |
Completed |
1996 |
|
$1,500,000 |
show |
Ionia Avenue Historic Streetscape
|
Oakes to Cherry |
|
|
Public Works |
Completed |
1999 |
|
$1,466,000 |
show |
Ionia Avenue Reconstruction
|
Fulton to Fountain |
|
|
Public Works |
Completed |
2009 |
|
$2,000,000 |
show |
ITP Central Station
|
Grandville and Bartlett |
|
|
New Construction |
Completed |
2004 |
|
$23,000,000 |
show |
ITP/The Rapid - Wealthy Operations Facility
|
320 Bartlett SW |
|
|
New Construction |
Under Construction |
2011 |
|
$33,000,000 |
show |
JW Marriott Hotel & Parking Structure
|
101 Campau NW |
|
|
New Construction |
Completed |
2007 |
|
$115,000,000 |
show |
Karl Building
|
098 Monroe Center NW |
|
|
Renovation |
Completed |
1982 |
|
$55,000 |
show |
Kelsey Apts - 12 Live/Work units
|
235 S Division |
|
|
Renovation |
Completed |
2006 |
|
$3,300,000 |
show |
Kendall Building
|
15 Monroe Center NW |
|
|
Renovation |
Planned |
2011 |
|
$4,000,000 |
show |
Kendall College/Ferris Building
|
120 Ionia NW Bldg |
|
|
Renovation |
Completed |
1999 |
|
$2,000,000 |
show |
Kendall School of Design
|
111 Division N. |
|
|
Renovation |
Completed |
1989 |
|
$1,300,000 |
show |
Kent County Courthouse
|
180 Ottawa NW |
|
|
New Construction |
Completed |
2001 |
|
$60,000,000 |
show |
LaGrave Ave. Fire Station
|
038 LaGrave SE |
|
|
Renovation |
Completed |
1987 |
|
$1,000,000 |
show |
LaGrave Church
|
107 LaGrave Av SE |
|
|
Addition |
Completed |
1997 |
|
$2,700,000 |
show |
Landmark Lofts-Phase I
|
801 Monroe NW |
|
|
Renovation |
Completed |
2001 |
|
$1,900,000 |
show |
Ledyard Bldg
|
118 Monroe Center, 125-145 Ottawa NW |
|
|
Renovation |
Completed |
1987 |
|
$9,200,000 |
show |
Ledyard Building
|
125 Ottawa NW |
|
|
Renovation |
Completed |
2007 |
|
$1,200,000 |
show |
Lenox Apartments
|
351 S Division Av |
|
|
Renovation |
Completed |
1998 |
|
$2,000,000 |
show |
Loose Leaf Building Apartments
|
333 Commerce SW |
|
|
Renovation |
Completed |
2008 |
|
$3,300,000 |
show |
Lorraine Bldg
|
124 Fulton SE |
|
|
Renovation |
Completed |
1984 |
|
$500,000 |
show |
Louis Benton Steak House
|
75 Monroe Center |
|
|
Renovation |
Completed |
2003 |
|
$1,000,000 |
show |
Louis Campau Parking Ramp
|
043 Monroe NW |
|
|
New Construction |
Completed |
1985 |
|
$4,100,000 |
show |
Louis Campau Promenade - Phase I
|
Monroe & Campau |
|
|
Public Works |
Replaced |
1983 |
|
$175,000 |
show |
Louis Campau Promenade - Repair Phase I
|
Monroe to Campau |
|
|
Public Works |
Completed |
2009 |
|
$1,000,000 |
show |
Louis Street Reconstruction
|
Campau to Grand River,Ottawa to Fulton |
|
|
Public Works,Public Works |
Completed,Planned |
2003,2009 |
|
$16,940,005,000,000 |
show |
Louis Street Reconstruction
|
Campau to Grand River,Ottawa to Fulton |
|
|
Public Works,Public Works |
Completed,Planned |
2003,2009 |
|
$16,940,005,000,000 |
show |
Lyon Square
|
Monroe to River |
|
|
Public Works |
Completed |
1985 |
|
$640,000 |
show |
Lyon Square Improvements
|
|
|
|
|
|
|
|
n/a |
show |
Lyon Street Reconstruction
|
Monroe to Division |
|
|
Public Works |
Completed |
2002 |
|
$2,068,000 |
show |
Market Avenue
|
Fulton to Finney |
|
|
Public Works |
Completed |
1996 |
|
$2,850,000 |
show |
Market Avenue Reconstruction
|
Finney to Wealthy |
|
|
Public Works |
Completed |
1997 |
|
$1,225,000 |
show |
Market Square/Bistro Bella Vita
|
44 Grandville SW |
|
|
Renovation |
Completed |
1997 |
|
$2,500,000 |
show |
Mary Free Bed
|
235 Wealthy SE |
|
|
Renovation |
Completed |
2002 |
|
$587,000 |
show |
Mary Free Bed
|
200 Wealthy SE. |
|
|
Addition |
Completed |
1989 |
|
$500,000 |
show |
Mary Free Bed - Mary Ives Hunting Bldg
|
360 Lafayette Av SE |
|
|
New Construction |
Completed |
2001 |
|
$4,511,309 |
show |
Mary Free Bed Hospital
|
235 Wealthy |
|
|
Renovation |
Completed |
2001 |
|
$3,775,000 |
show |
Mary Free Bed Hospital
|
235 Wealthy |
|
|
Renovation |
Completed |
1996 |
|
$855,626 |
show |
Mary Free Bed Parking Ramp
|
350 Lafayette Ave SE,350 Lafayette SE |
|
|
Addition,Addition |
Completed,Completed |
1993,1994 |
|
$18,000,001,825,000 |
show |
Mary Free Bed Pkg Fac
|
350 Lafayette Ave SE,350 Lafayette SE |
|
|
Addition,Addition |
Completed,Completed |
1993,1994 |
|
$18,000,001,825,000 |
show |
Mary Free Bed Prof Bldg
|
350 Lafayette Av SE |
|
|
Addition |
Completed |
1998 |
|
$1,525,000 |
show |
Mary Free Bed Prof. Bldg
|
350 Lafayette Ave SE |
|
|
Addition |
Completed |
1995 |
|
$2,798,000 |
show |
Mary Free Bed Professional Building
|
350 Lafayette |
|
|
Renovation |
Completed |
2002 |
|
$587,000 |
show |
Mary Free Bed Profl Med Ctr & Pkg
|
350 Lafayette & 235 Wealthy SE |
|
|
New Construction |
Completed |
1989 |
|
$8,300,000 |
show |
Masonic Temple
|
233 Fulton NE |
|
|
Renovation |
Completed |
1985 |
|
$750,000 |
show |
Mel Trotter Bldg
|
225 Commerce SW |
|
|
Renovation |
Completed |
1998 |
|
$2,530,000 |
show |
Mel Trotter Shelter
|
225 Commerce Av SW |
|
|
Renovation |
Completed |
2001 |
|
$4,500,000 |
show |
Metropolitan Park Apartments
|
334 Ionia SW |
|
|
New Construction |
Completed |
2007 |
|
$3,300,000 |
show |
Michigan Hill Project Tower 25 (Phase I)
|
25 Michigan NW |
|
|
New Construction |
Completed |
2009 |
|
$60,000,000 |
show |
Michigan Hill Project Tower 35 (Phase 2)
|
35 Michigan NW |
|
|
New Construction |
Under Construction |
2011 |
|
$60,000,000 |
show |
Michigan State University College of Human Medicine
|
15 Michigan NW |
|
|
New Construction |
Completed |
2010 |
|
$90,000,000 |
show |
Michigan Street
|
Barclay to Union |
|
|
Public Works |
Completed |
1997 |
|
$1,875,000 |
show |
Michigan Street
|
Monroe to Barclay |
|
|
Public Works |
Completed |
1995 |
|
$1,875,000 |
show |
Michigan Street Bridge - at Division Ave
|
Michigan & Division |
|
|
Public Works |
Completed |
2007 |
|
$4,000,000 |
show |
Minnhaar Building
|
049 Monroe Center NW |
|
|
Renovation |
Completed |
1980 |
|
$500,000 |
show |
Monroe Avenue NW - Reconstruction
|
Michigan to Newberry |
|
|
Public Works |
Completed |
2001 |
|
$3,000,000 |
show |
Monroe Center - Phase II
|
Ottawa to Monroe |
|
|
Public Works |
Completed |
2001 |
|
$8,535,909 |
show |
Monroe Center II Ramp - 554 Spaces
|
Louis NW |
|
|
New Construction |
Completed |
2002 |
|
$12,000,000 |
show |
Monroe Center Mall
|
Pearl to Fulton |
|
|
Public Works |
Replaced |
1980 |
|
$4,500,000 |
show |
Monroe Center Phase I
|
Ottawa to Division |
|
|
Public Works |
Completed |
1997 |
|
$6,425,000 |
show |
Monroe North Hotel - Suburban Inn
|
748 Monroe NW |
|
|
New Construction |
Planned |
2011 |
|
$28,000,000 |
show |
Monroe Terrace
|
600 Monroe |
|
|
Renovation |
Completed |
2002 |
|
$3,000,000 |
show |
Mr. Fables
|
216 Division N. |
|
|
Renovation |
Replaced |
1983 |
|
$155,000 |
show |
National City Building
|
171 Monroe NW |
|
|
Renovation |
Completed |
1998 |
|
$850,000 |
show |
Next Work Lofts
|
111 Division S |
|
|
Renovation |
Planned |
2009 |
|
$3,800,000 |
show |
North Parking Structure - Spectrum
|
251 Michigan Ave NE |
|
|
Addition |
Completed |
2001 |
|
$7,500,000 |
show |
Oakes Street Park
|
Oakes & Ionia |
|
|
Public Works |
Completed |
2005 |
|
$64,000 |
show |
Old Iron Rail Road Bridge
|
N/A |
|
|
Public Works |
Completed |
1988 |
|
$900,000 |
show |
One Ionia Place
|
001 Ionia SW |
|
|
Renovation |
Completed |
1982 |
|
$700,000 |
show |
One Trick Pony
|
136 Fulton E |
|
|
Renovation |
Completed |
1997 |
|
$250,000 |
show |
Ottawa Apts - Swift Printing
|
400 Bridge NW |
|
|
Renovation |
Completed |
2001 |
|
$1,900,000 |
show |
Ottawa Avenue
|
Fairbanks to Hastings |
|
|
Public Works |
Completed |
2007 |
|
$2,000,000 |
show |
Ottawa Avenue Reconstruction
|
Fountain to Michigan |
|
|
Public Works |
Completed |
1998 |
|
$1,100,000 |
show |
Ottawa-Fulton Parking Ramp
|
22 Ottawa Ave NW |
|
|
New Construction |
Completed |
1997 |
|
$11,100,000 |
show |
Parke-Century Bldg
|
168 Louis Campau NW |
|
|
Renovation |
Completed |
1983 |
|
$1,500,000 |
show |
Peacock Bldg
|
150 Fulton E. |
|
|
Renovation |
Completed |
1985 |
|
$100,000 |
show |
Pearl & Ionia City Parking Ramp
|
028 Pearl NW |
|
|
New Construction |
Completed |
1992 |
|
$8,500,000 |
show |
Pearl Street
|
Monroe to Ottawa |
|
|
Public Works |
Completed |
2002 |
|
$2,300,000 |
show |
Pearl Street
|
Ottawa to Division |
|
|
Public Works |
Completed |
2005 |
|
$1,575,000 |
show |
Pearl Street Bridge
|
N/A |
|
|
Public Works |
Completed |
1985 |
|
$2,800,000 |
show |
Peck Bldg
|
34 Monroe Ctr NW |
|
|
Renovation |
Completed |
1999 |
|
$2,000,000 |
show |
Peninsular Club
|
120 Ottawa NW |
|
|
Renovation |
Completed |
2005 |
|
$1,300,000 |
show |
Penisular Club
|
120 Ottawa NW |
|
|
Addition |
Completed |
1996 |
|
$1,300,000 |
show |
Penn Plaza
|
126 Ottawa NW |
|
|
Renovation |
Completed |
1998 |
|
$225,000 |
show |
Penn Plaza
|
126 Ottawa NW |
|
|
Renovation |
Completed |
2000 |
|
$820,000 |
show |
Peoples Bldg
|
60 Monroe Center NW |
|
|
Renovation |
Completed |
2004 |
|
$2,020,000 |
show |
Peoples Bldg - Select Bank
|
60 Monroe Center NW |
|
|
Renovation |
Completed |
2004 |
|
$3,000,000 |
show |
Peoples Building
|
60 Monroe Center NW |
|
|
Renovation |
Completed |
1986 |
|
$4,600,000 |
show |
Photo Studio
|
312 Ellsworth SW |
|
|
Renovation |
Completed |
2000 |
|
$200,000 |
show |
Plante & Moran Building
|
634 Front NW |
|
|
New Construction |
Completed |
2008 |
|
$10,300,000 |
show |
Plaza Towers
|
011 Monroe NW |
|
|
Renovation |
Completed |
1998 |
|
$34,000,000 |
show |
Procare System Building
|
61 Commerce SW |
|
|
Renovation |
Completed |
2008 |
|
$3,000,000 |
show |
Public Library Parking Lot Improv
|
060 Library Plaza NE |
|
|
Public Works |
Completed |
1988 |
|
$180,000 |
show |
Public Museum Mini-Park & Parking
|
Jefferson & State St. |
|
|
Public Works |
Completed |
1980 |
|
$30,000 |
show |
Purple East
|
250 Ionia SW |
|
|
New Construction |
Completed |
2000 |
|
$1,700,000 |
show |
Ransom Ave. Senior Citizen Housing
|
050 Ransom NE |
|
|
New Construction |
Completed |
1980 |
|
$5,800,000 |
show |
Rapids Park
|
Between Hall of Justice & River |
|
|
Public Works |
Replaced |
1981 |
|
$20,000 |
show |
River City Building
|
201 Monroe NW |
|
|
Renovation |
Completed |
2010 |
|
$10,000,000 |
show |
River City Slims
|
243 Commerce SW |
|
|
Renovation |
Completed |
2007 |
|
$1,600,000 |
show |
River Front Plaza
|
055 Campau NW |
|
|
Renovation |
Completed |
1998 |
|
$3,885,000 |
show |
River House Condominiums
|
335 Bridge NW |
|
|
New Construction |
Completed |
2008 |
|
$80,000,000 |
show |
Riverbank Boardwalk
|
Fulton to Michigan |
|
|
Public Works |
Completed |
1992 |
|
$1,700,000 |
show |
Riverfront Plaza
|
55 Campau Av NW |
|
|
Renovation |
Completed |
2001 |
|
$4,000,000 |
show |
Riverfront Plaza Bldg
|
55 Campau NW |
|
|
Addition |
Completed |
2006 |
|
$3,200,000 |
show |
Riverfront Plaza Bldg
|
055 Campau NW |
|
|
Addition |
Completed |
1986 |
|
$7,500,000 |
show |
Rood Building
|
139 Pearl NW |
|
|
Renovation |
Planned |
2011 |
|
n/a |
show |
Seward Avenue Extension - Fulton to Lexington
|
Seward Ave |
|
|
New Construction |
Planned |
2012 |
|
$3,400,000 |
show |
Showgirl Galleria
|
234 Market SW |
|
|
Renovation |
Completed |
2006 |
|
$1,000,000 |
show |
Sierra Room
|
25 Ionia Av SW |
|
|
Renovation |
Completed |
1997 |
|
$1,800,000 |
show |
Singer Sculpture
|
East Riverbank north of Fulton St |
|
|
Public Works |
Completed |
1995 |
|
$1,300,000 |
show |
Spectrum Health
|
100 Michigan NE |
|
|
Renovation |
Completed |
2001 |
|
$9,200,000 |
show |
Spectrum Health
|
100 Michigan NE |
|
|
Renovation |
Completed |
2001 |
|
$5,263,000 |
show |
Spectrum Health - Cardiac Center
|
100 Michigan St NE |
|
|
New Construction |
Completed |
2004 |
|
$137,000,000 |
show |
Spectrum Health - Cook Institute
|
251 Michigan St NE |
|
|
Addition |
Completed |
1996 |
|
$3,200,000 |
show |
Spectrum Health - Helen DeVos Children's Hospital
|
100 Michigan NE |
|
|
New Construction |
Under Construction |
2011 |
|
$265,000,000 |
show |
Spectrum Health - Helen DeVos Pavilion
|
330 Barclay |
|
|
New Construction |
Completed |
1996 |
|
$8,000,000 |
show |
Spectrum Health - Lemmon-Holton Cancer Pavilion
|
145 Michigan NE |
|
|
New Construction |
Completed |
2008 |
|
$78,000,000 |
show |
Spectrum Health - Neo Natal Care Unit
|
100 Michigan NE |
|
|
Renovation |
Completed |
1997 |
|
$6,400,000 |
show |
Spectrum Health - Patient Care Unit
|
100 Michigan NE |
|
|
Renovation |
Completed |
1997 |
|
$1,600,000 |
show |
Spectrum Health - Pkg Rmp Exp (750 spaces)
|
421 Lafayette NW |
|
|
New Construction |
Completed |
2004 |
|
$7,340,000 |
show |
Spectrum Health - Renucci Hospitality House
|
Ransom Ave NE |
|
|
New Construction |
Completed |
1999 |
|
$3,861,000 |
show |
Spectrum Health- Barclay Pkg Ramp
|
Barclay Ave NE |
|
|
New Construction |
Completed |
2001 |
|
$10,000,000 |
show |
Spectrum Health Bldg
|
100 Michigan NE |
|
|
New Construction |
Completed |
1995 |
|
$5,800,000 |
show |
Spectrum Health Butterworth Hospital
|
100 Michigan St NE |
|
|
Renovation |
Completed |
1994 |
|
$2,800,000 |
show |
Spectrum Health East Pkg Ramp
|
216 Michigan St NE |
|
|
New Construction |
Completed |
1994 |
|
$3,200,000 |
show |
Spectrum Health Musculoskeletal Ctr
|
230 Michigan St NE |
|
|
New Construction |
Completed |
1994 |
|
$5,775,000 |
show |
Spectrum Health NorthPkg Ramp
|
201 Michigan St NE |
|
|
New Construction |
Completed |
1992 |
|
$3,500,000 |
show |
Specturm Health-- Emergency
|
Barclay NE |
|
|
Renovation |
Completed |
2003 |
|
$13,100,000 |
show |
Square Center Bldg
|
169 Monroe NW |
|
|
Renovation |
Completed |
1983 |
|
$1,500,000 |
show |
St Mary Health Services - Lacks Cancer Ctr
|
Cherry/Jefferson |
|
|
New Construction |
Completed |
2004 |
|
$45,000,000 |
show |
St Mary's Health Services
|
200 Jefferson SE |
|
|
Renovation |
Completed |
2001 |
|
$10,000,000 |
show |
St Mary's Health Services
|
200 Jefferson Av SE |
|
|
Renovation |
Completed |
1995 |
|
$900,000 |
show |
St Mary's Wege Center for Health & Learning
|
320 Lafayette Ave SE |
|
|
New Construction |
Completed |
1999 |
|
$2,350,000 |
show |
St Mary's Wege Center Pkg Ramp
|
300 Lafayette Ave SE |
|
|
New Construction |
Completed |
1999 |
|
$2,100,000 |
show |
St. Cecelia Music Society
|
024 Ransom NE |
|
|
Renovation |
Completed |
1998 |
|
$2,552,000 |
show |
St. Cecelia Music Society
|
024 Ransom NW |
|
|
Renovation |
Completed |
1987 |
|
$2,000,000 |
show |
St. Cecilia Music Society
|
24 Ransom Av NE |
|
|
Renovation |
Completed |
2000 |
|
$2,350,000 |
show |
St. George Orthodox
|
334 LaGrave SE |
|
|
Renovation |
Completed |
1998 |
|
$1,000,000 |
show |
St. George Orthodox
|
334 LaGrave SE |
|
|
New Construction |
Completed |
1999 |
|
$400,000 |
show |
St. Mary's Prof Bldg
|
300 Lafayette Ave SE |
|
|
New Construction |
Completed |
1998 |
|
$5,042,000 |
show |
St. Mary's Hauenstein Center
|
200 Jefferson SE |
|
|
New Construction |
Completed |
2009 |
|
$60,000,000 |
show |
St. Mary's Health Park
|
245 Cherry SE |
|
|
New Construction |
Completed |
1989 |
|
$3,850,000 |
show |
St. Mary's Health Services
|
200 Jefferson SE |
|
|
Renovation |
Completed |
1989 |
|
$4,000,000 |
show |
St. Mary's Hospital
|
200 Jefferson SE |
|
|
Renovation |
Completed |
2001 |
|
$746,000 |
show |
St. Mary's Hospital
|
200 Jefferson SE |
|
|
Renovation |
Completed |
2001 |
|
$826,000 |
show |
St. Mary's Hospital
|
200 Jefferson Ave SE |
|
|
Renovation |
Completed |
2001 |
|
$405,000 |
show |
St. Mary's Hospital
|
200 Jefferson SE |
|
|
Renovation |
Completed |
1998 |
|
$2,180,000 |
show |
St. Mary's Hospital
|
200 Jefferson SE |
|
|
Renovation |
Completed |
2001 |
|
$1,050,000 |
show |
Steketees Department Store
|
028 Fountain NW |
|
|
Renovation |
Replaced |
1986 |
|
$3,200,000 |
show |
Stella's/Viceroy
|
53 Commerce |
|
|
Renovation |
Under Construction |
2010 |
|
n/a |
show |
Stelter Bldg
|
300 Ionia SW |
|
|
Renovation |
Completed |
2003 |
|
$562,986 |
show |
Tannery Row
|
16 Ionia Av SW |
|
|
Renovation |
Completed |
1997 |
|
$1,681,000 |
show |
Taps Dance Club
|
048 Fulton W |
|
|
Renovation |
Completed |
1999 |
|
$200,000 |
show |
Taps Sports Bar
|
008 Ionia SW |
|
|
Renovation |
Completed |
1998 |
|
$350,000 |
show |
The B.O.B.
|
20 Monroe Av NW |
|
|
Renovation |
Completed |
1997 |
|
$3,600,000 |
show |
The B.O.B. - Addition
|
020 Monroe NW |
|
|
Addition |
Completed |
2001 |
|
$1,000,000 |
show |
The Black Rose Irish Pub
|
100 Ionia |
|
|
Renovation |
Completed |
2004 |
|
$830,000 |
show |
The Gallery on Fulton
|
2 Fulton W |
|
|
New Construction |
Under Construction |
2010 |
|
$30,000,000 |
show |
The Gallery on Fulton Parking Ramp
|
2 Fulton W |
|
|
New Construction |
Under Construction |
2010 |
|
$9,400,000 |
show |
The Law Building
|
330 Ionia NW |
|
|
New Construction |
Completed |
1995 |
|
$7,000,000 |
show |
The Loft Apartments
|
75 Sheldon Blvd SE |
|
|
Renovation |
Completed |
1999 |
|
$5,000,000 |
show |
The Pyramid Scheme
|
68 Commerce |
|
|
Renovation |
Proposed |
2011 |
|
n/a |
show |
The Republic/ Rockwell
|
45 Division S |
|
|
Renovation |
Completed |
2008 |
|
$5,000,000 |
show |
The Van Andel Institute
|
333 Bostwick NE |
|
|
Renovation |
Completed |
2001 |
|
$2,000,000 |
show |
Thirty Eight
|
38 Commerce SW |
|
|
New Construction |
Completed |
2010 |
|
$15,600,000 |
show |
Tiki Bob's
|
058 Ionia SW |
|
|
Renovation |
Completed |
2002 |
|
$750,000 |
show |
Torco Building
|
47 Commerce SW |
|
|
Renovation |
Completed |
2006 |
|
$2,000,000 |
show |
Trade Center Bldg
|
050 Louis NW |
|
|
Renovation |
Completed |
1983 |
|
$1,500,000 |
show |
Trade Center Building
|
50 Louis NW |
|
|
Renovation |
Completed |
2006 |
|
$1,500,000 |
show |
Transitions Inc Bldg
|
201 Sheldon SE |
|
|
Renovation |
Completed |
1990 |
|
$1,200,000 |
show |
Travel Consultants
|
32 Market SW |
|
|
Renovation |
Completed |
1997 |
|
$1,200,000 |
show |
Trust Bldg
|
040 Pearl NW |
|
|
Renovation |
Completed |
1983 |
|
$2,200,000 |
show |
Trust Building
|
040 Pearl NW |
|
|
Renovation |
Completed |
2001 |
|
$540,000 |
show |
Trust Building - Standard Federal
|
040 Pearl NW |
|
|
Renovation |
Completed |
2002 |
|
$840,000 |
show |
Two Fountain Place
|
002 Fountain NE |
|
|
Renovation |
Completed |
1986 |
|
$1,600,000 |
show |
U.I.C.A. Bldg
|
41 Sheldon Blvd SE |
|
|
Renovation |
Completed |
1998 |
|
$1,600,000 |
show |
Union Square Condominiums
|
600 Broadway NW |
|
|
Renovation |
Completed |
2007 |
|
$18,000,000 |
show |
United Way Center
|
118 Commerce SW |
|
|
Renovation |
Completed |
2000 |
|
$1,289,000 |
show |
Uno Oolio's
|
188 Monroe NW |
|
|
Renovation |
Replaced |
1983 |
|
$100,000 |
show |
Urban Market
|
435 Ionia Ave SW |
|
|
Renovation |
Planned |
2012 |
|
$31,000,000 |
show |
Urban Wellness Center
|
975 Ottawa Ave NW |
|
|
Renovation |
Planned |
2011 |
|
$2,700,000 |
show |
US 131 Exit Ramp-Cherry & Oakes St
|
Cherry & Oakes St. |
|
|
Public Works |
Completed |
1999 |
|
$7,937,000 |
show |
US Bankruptcy Court
|
1 N Division |
|
|
Renovation |
Completed |
2006 |
|
$4,000,000 |
show |
US Exchange/Choice One
|
056 Grandville SW |
|
|
Renovation |
Completed |
1999 |
|
$1,700,000 |
show |
Van Andel Arena
|
130 W Fulton St |
|
|
New Construction |
Completed |
1996 |
|
$77,000,000 |
show |
Van Andel Institute
|
333 Bostwick NE |
|
|
New Construction |
Completed |
1999 |
|
$70,000,000 |
show |
Van Andel Institute - Phase II
|
333 Bostwick NE |
|
|
Addition |
Completed |
2010 |
|
$175,000,000 |
show |
Vanderlende Bldg
|
131 Division S |
|
|
Renovation |
Completed |
1999 |
|
$252,500 |
show |
Verne Barry Place
|
60 S Division |
|
|
Renovation |
Completed |
2008 |
|
$17,000,000 |
show |
Washington Square Medical Bldg Rehab
|
309 Jefferson SE |
|
|
Renovation |
Completed |
1980 |
|
$600,000 |
show |
Waters Bldg
|
161 Ottawa NW |
|
|
Renovation |
Completed |
1988 |
|
$1,600,000 |
show |
Weather Protected Walkway
|
Across Pearl St. |
|
|
Public Works |
Completed |
1982 |
|
$400,000 |
show |
Welsh Civic Auditorium
|
245 Monroe NW |
|
|
Renovation |
Replaced |
1985 |
|
$6,000,000 |
show |
Wenham Building
|
020 Monroe Center NE |
|
|
Renovation |
Completed |
1982 |
|
$700,000 |
show |
Westminster Church Expansion
|
047 Jefferson SE |
|
|
Addition |
Completed |
1986 |
|
$1,000,000 |
show |
Westminster Presbyterian Church
|
047 Jefferson SE |
|
|
Addition |
Completed |
2001 |
|
$1,500,000 |
show |
Westminster Presbyterian Church
|
047 Jefferson SE |
|
|
Renovation |
Completed |
1998 |
|
$145,000 |
show |
Weston Apartments
|
021 Weston SW & 044 Ionia SW |
|
|
Renovation |
Completed |
1984 |
|
$8,200,000 |
show |
Weston East Apts
|
21 Weston SW |
|
|
Renovation |
Completed |
2007 |
|
$6,650,000 |
show |
Weston St. Extension
|
N/A |
|
|
Public Works |
Replaced |
1989 |
|
$355,000 |
show |
Weston Street
|
Sheldon to Division |
|
|
Public Works |
Completed |
2002 |
|
$510,000 |
show |
Weston West Apts
|
44 Ionia SW |
|
|
Renovation |
Completed |
2007 |
|
$6,650,000 |
show |
White-Godfrey Bldg
|
|
|
|
Renovation |
Completed |
1988 |
|
$330,000 |
show |
Willard Building - Bobby J's Restaurant
|
150 E Fulton |
|
|
Renovation |
Completed |
2006 |
|
$500,000 |
show |
Women's Health Center of West Michigan
|
555 Mid Towne |
|
|
New Construction |
Completed |
2008 |
|
$25,000,000 |
show |
YMCA Building
|
033 Library NE |
|
|
Renovation |
Replaced |
1991 |
|
$4,000,000 |
show |
YMCA Renovation
|
033 Library NE |
|
|
Renovation |
Replaced |
1986 |
|
$1,000,000 |
show |
YWCA Building
|
025 Sheldon SE |
|
|
Renovation |
Completed |
1993 |
|
$1,800,000 |
show |